1. 3D Animation of the Colorado Boulevard Detention Ponds: An animated camera flys from the northern pond to the southern pond. Water is surcharged from the south to the north by a culvert below I-70 and area inlets which equalizes water levels between the two ponds.
2. 3D Animation of the I-70 Corridor: An animated camera follows I-70 from Brighton Boulevard to Dahlia Street placing the detention ponds and drainage systems, located at Brighton Boulevard, York Street, Vasquez Boulevard/Steele Street and Colorado Boulevard, in context with the rest of the transportation project. 3D Animations Click thumbnail images at right to toggle the animated 3d model visualizations:
| ||||||||||||||||||||||||||||||||||||||||||||||||||||